In our business we develop mine properties. We locate the mine property, we prove the property with assay studies and with R&D work. But the ultimate proof is pilot plant work. On our projects we must prove that the precious metals will come out of the selected ore body with pilot plant equipment. Also a big part of our work has to do with collecting micro fine gold. Over the years we have worked with different shaker tables as part of our work and today my favorite shaker table is the MBMM Table. We have used that table to prove different projects and to harvest some very fine gold. In our studies the particle size data and pictures show that we have harvested minus 400 mesh gold with the MBMM Tables more than once.

The other day a customer came to see us and asked could we build a plant to harvest copper from depopulated PC boards. Until that point we had not even consider this type of work, but we took his suitcase of boards and tried. We used a MBMM Hammer Mill and a MBMM Table while our customer watched our work. A few hours later our customer was greatly astonished he had never seen such a clean copper product (96% copper) harvested with mechanical equipment. We were also amazed that with just a few hours of working with the boards and learning how to process them and without having taken on such a job before we could achieve such a harvest. It was like the MBMM Mill and Table was designed for this job.

Thanks for making good products.

- Dusty Wadsworth (Gold Miner, Mexico)