As a countertop fabricator, stone waste from the edges of the slabs is a constant headache and expense to deal with. We dispose of 5,000 lbs of cut-offs a day and the dumpster fees for disposal was getting out of hand. We purchased a crusher system from MBMM and have been very happy with the results and cost savings. The machine paid for itself in less than 2 years! (Matt reports that when he first got the system, he crushed a pile of waste we estimated to be 4,000 tons!)